ELCO Combined Heat and Power Plant
Trigon L 100 Gas Condensing Boiler
Year of Manufacture 2006
Gas condensing boiler, heating output 90 kW
approx. 700–800 ltr. buffer tank
Combined heat and power plant approx. 40–50 kW
2 x approx. 500 ltr. buffer tanks
Expansion vessels (diaphragm pressure vessels): 1 x 140 ltr., 1 x 250 ltr., 1 x 35 ltr.
Complete with pipes and insulation shell for buffer tanks, operating instructions
Heated a multi-family house with 6 apartments
Trigon L 100 Gas Condensing Boiler
Year of Manufacture 2006
Gas condensing boiler, heating output 90 kW
approx. 700–800 ltr. buffer tank
Combined heat and power plant approx. 40–50 kW
2 x approx. 500 ltr. buffer tanks
Expansion vessels (diaphragm pressure vessels): 1 x 140 ltr., 1 x 250 ltr., 1 x 35 ltr.
Complete with pipes and insulation shell for buffer tanks, operating instructions
Heated a multi-family house with 6 apartments
Source: https://www.fwb-maschinenhandel.com/machines/heating-system/2584.htm














